Assembly
Assembly processes:
- Bearing installation, bearing swaging, roller swaging, bearing staking, anvil staking, ball staking, proof-loading and testing.
- Bushing installation, sizing, press-fit and shrink fit.
- Lee plug installation.
- Helicoil & Kato inserts, Keensert, Rosan Fittings and threaded fastener installation.
- Riveting (cherry max, cherry lock, blind rivets).
- Mechanical and sub-assemblies (nutplates, huckbolts, lockbolts, clinch nuts, Hi-Lok, Hi-Shear).
- Lanyards and lockwire/safety wire assemblies.
- Fatigue Technologies - Cold work.
- Electrical assembly (crimping, soldering, potting), harness assembly, wire & cable assembly.
- Ground stud installation, torquing and electrical bond testing.
- Cable swaging and pull testing.
- Certified Clickbond installation and testing to CBPS206 & CBPS207 plus LMA-PK004A.
- Primers, Sealant, Loctite, Silicone and Adhesive sealing to all Aerospace Specifications.