Assembly

Assembly processes:

  • Bearing installation, bearing swaging, roller swaging, bearing staking, anvil staking, ball staking, proof-loading and testing.
  • Bushing installation, sizing, press-fit and shrink fit.
  • Lee plug installation.
  • Helicoil & Kato inserts, Keensert, Rosan Fittings and threaded fastener installation.
  • Riveting (cherry max, cherry lock, blind rivets).
  • Mechanical and sub-assemblies (nutplates, huckbolts, lockbolts, clinch nuts, Hi-Lok, Hi-Shear).
  • Lanyards and lockwire/safety wire assemblies.
  • Fatigue Technologies - Cold work.
  • Electrical assembly (crimping, soldering, potting), harness assembly, wire & cable assembly.
  • Ground stud installation, torquing and electrical bond testing.
  • Cable swaging and pull testing.
  • Certified Clickbond installation and testing to CBPS206 & CBPS207 plus LMA-PK004A.
  • Primers, Sealant, Loctite, Silicone and Adhesive sealing to all Aerospace Specifications.