Assembly processes:
Bearing installation, bearing swaging, roller swaging, bearing staking, anvil staking, ball staking, proof-loading and testing.
Bushing installation, sizing, press-fit and shrink fit.
Lee plug installation.
Helicoil & Kato inserts, Keensert, Rosan Fittings and threaded fastener installation.
Riveting (cherry max, cherry lock, blind rivets).
Mechanical and sub-assemblies (nutplates, huckbolts, lockbolts, clinch nuts, Hi-Lok, Hi-Shear).
Lanyards and lockwire/safety wire assemblies.
Fatigue Technologies - Cold work.
Electrical assembly (crimping, soldering, potting), harness assembly, wire & cable assembly.
Ground stud installation, torquing and electrical bond testing.
Cable swaging and pull testing.
Certified Clickbond installation and testing to CBPS206 & CBPS207 plus LMA-PK004A.
Primers, Sealant, Loctite, Silicone and Adhesive sealing to all Aerospace Specifications.